Example report 21 · Construction · Regression

Estimate construction costs early

Estimate project cost per square meter from planning information.

All examples

Recommended by Impulse AI

Impulse AI result

Selected model: Impulse AI custom model

Standard algorithms and custom models are candidates within the Impulse AI workflow—not competing services.

Illustrative test result · MAE
224 USD/m²

Provide a preliminary planning estimate for professional review.

Records
30,000 fictional projects
Training / test
24,000 / 6,000
Metric
MAE · lower is better
Models evaluated
8

01The business question

Estimate project cost per square meter from planning information.

Each record represents one project. The target to predict is cost_per_square_meter.

What you would do with it

Provide a preliminary planning estimate for professional review.

02The input data

  • floor_areainput
  • labor_indexinput
  • material_indexinput
  • accessibility_scoreinput
  • building_heightinput
  • site_densityinput
  • cost_per_square_metertarget

Group-held-out 80/20 split; repeated entities stay in the same partition.

03Models evaluated

This illustrative recommendation represents model selection on training/validation data. The separate test scores below show how the candidates compare; a real workflow must not use its final test set to choose a model. Lower is better for MAE.

Candidates within the Impulse AI workflow; fictional test scores, not a ranking of competing services
Candidate modelTest MAE (illustrative)
Impulse AI custom modelSelected by Impulse AI224 USD/m²
XGBoost262.1 USD/m²
CatBoost285.6 USD/m²
LightGBM309.1 USD/m²
Extra Trees332.6 USD/m²
Random Forest356.2 USD/m²
Ridge Regression379.7 USD/m²
Training-target meanbaseline403.2 USD/m²

04Practical takeaway

In this fictional report, Impulse AI selects Impulse AI custom model, with an illustrative test result of 224 USD/m², compared with 403.2 USD/m² for the Training-target mean baseline. Impulse AI’s role is to evaluate candidates and deliver the selected model, whether it uses a standard algorithm or a custom model. The prediction supports one decision: provide a preliminary planning estimate for professional review.

05Limitations

  • Regional labor, inflation and unusual designs can shift costs sharply. This is not a quotation or an appraisal.
  • All rows and scores are invented for illustration; a real table would need its own evaluation.
  • A single test split gives one estimate; scores on new data will vary.

06Source of inspiration

Solafune · Submission deadline March 15, 2026; late submission phase

Construction Cost Prediction(opens in new tab)

The linked sources inspired this fictional problem; the report may simplify or adapt the original task. No source datasets were downloaded or evaluated, and no competition results were copied.

07Exploratory data profile

A compact illustrative profile of the 6 inputs, not the full checks a real engine run performs. 720 missing values appear across the table. All ranges are fictional.

Illustrative column profile, fictional values
ColumnTypeValidMissingMissing %UniqueMeanStd devMin25%Median75%MaxZeros %
floor_areaNumeric30,00000.0%1002516.667012.52537.52001.0%
labor_indexNumeric30,00000.0%22111221.33380961121281600.0%
material_indexNumeric29,4605401.8%34211221.33380961121281600.0%
accessibility_scoreNumeric30,00000.0%1210.640.2400.460.640.8211.0%
building_heightNumeric29,8201800.6%5847348.667036.573109.55202.5%
site_densityNumeric30,00000.0%7058556.667042.585127.56004.0%

08Use your model

Download model

Take a reusable model package to run predictions in your own environment.

Host for inference

Have Impulse AI host your model so you can send new data for predictions.